Project Brief:

Positioning of two large sorting machines on to a mezzanine floor.

Project Timeframe:

Two hours.

Project Delivery:

Tech Move Solutions received an urgent call from Pitney Bowes asking for help and assistance. Two large sorting machines were delivered to one of their customers but they had no way of positioning them on to their mezzanine floor that they had to be located on. Time constraints required the machines to be positioned the same day and we arranged a site survey within one hour of receiving the call and then began to set about putting a solution in place to assist Pitney Bowes and their customer. A 5t fork-lift with extended blades was required in addition to a two man crew. Arrangements were made to get the fork-lift to site the same afternoon and a our crew arrived on site at 5pm and began to prepare the machine for lifting.

Project Outcome:

Both machines were successfully lifted on to the mezzanine and positioned as instructed by the customer. All of this was done on the same day that the “emergency call” was received from Pitney Bowes.